After-sales Service: | Spare Parts Service |
---|---|
Warranty: | 6 Months |
Hydraulic: | Kawasaki Pump |
Working Condition: | Very Good |
Max. Lifting Capacity/T: | 75t |
Max. Load Moment: | 203.5t.M |
Customization: |
---|
Suppliers with verified business licenses
Standard main boom working condition- rated lifting capacity
|
75t
|
Standard main boom working condition- lifting moment
|
13~52 m
|
Standard main boom working condition-basic boom length
|
12m
|
Standard main boom working condition-the longest main boom
|
203.5 t•m
|
Standard main boom working condition-main boom luffing angle
|
30°~80°
|
Fixed jib working condition- rated lifting capacity
|
10°, 30°
|
Fixed jib working condition- lifting moment
|
6.7t×22m
|
Fixed jib working condition-main boom length
|
0~50m/min (Fourth floor) (Plug in solenoid valve plug to reach 72
|
Fixed jib working condition-jib length
|
9m~18m
|
Fixed jib working condition-the longest main boom + the longest jib
|
0~1.2km/h
|
Speed parameter-main/auxiliary winch rope speed
|
0~120m/min (third layer)
|
Speed parameter-increase the rated single rope force
|
0 m/min~124m/min
|
Speed parameter-luffing rope speed
|
0~57m/min (fourth floor) (plug in electric valve up to 100
|
Speed parameter-rotation speed
|
0 m/min ~144m/min
|
Speed parameter-walking speed
|
0~1.2 Km/h
|
Speed parameter-gradeability
|
0 km/h~1.2 km/h /0 km/h~0.53km/h (double speed)
|
engine model
|
6CTAA8.3-C240
|
Engine-output power
|
242kW
|
Engine-Rated Speed
|
24t
|
Transport parameters-weight of the whole machine (basic arm + 75t hook
|
45t
|
Transport parameters-counterweight weight
|
13320mm×3000mm×3200mm
|
Transport parameters- Single piece transport weight (with lower boom, without rear counterweight)
|
0.14MPa
|
FAQ
1.What are your advantages compared with other suppliers and manufacturers?
High quality:
As a professional and reliable supplier, we are experienced in the QualityInspection and Control.Every product will be strictly
inspected before it is delivered to our customers.
Competitive price:
We are so glad to provide the most favorable prices for our customers. And the prices are negotiable by which a win-win result
could be achieved.
2. Which payment terms are available us ?
T/T terms or other. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment.
3. How long with the delivery?
Normally it takes about 20 days.
4. How about service?
24 hours online, and skype/QQ/wechat/whatsapp so on
5. Whats pareparts can you supply?
All kinds of spare parts of Hitachi Cat Sumitomo Kobelco Doosan , Zoomlion,, Shantui,,Lugong,,XGMA,CUMMINS ENGINE,etc.
Suppliers with verified business licenses