Customization: | Available |
---|---|
After-sales Service: | Spare Parts Service |
Warranty: | 6 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Operating performance parameters | ||
Maximum rated lifting capacity of main boom | (t) | 180 |
Maximum rated lifting capacity of fixed jib | (t) | 33.5 |
Maximum rated lifting capacity of luffing jib | (t) | 50 |
Maximum lifting moment | (t.m) | 1043.8 |
Maximum lifting capacity of tower jib | (t) | 50 |
Maximum rated lifting capacity of single pulley at arm end | (t) | - |
Maximum rated lifting capacity of special jib | (t) | - |
Size parameters | ||
Main boom length | (m) | 19~82 |
Main boom luffing angle | (°) | 30~83 |
Fixed jib length | (m) | 13~31 |
Tower jib length | (m) | 20~59 |
Maximum size of a single piece in transportation state (L×W×H) | (m) | 12.5×3.0×3.3 |
Fixed jib installation angle | (°) | 15, 30 |
Dedicated jib length | (m) | - |
Speed parameter | ||
Maximum single rope speed of hoisting mechanism | (m/min) | 120/138 |
Maximum single rope speed of main boom luffing mechanism | (m/min) | 2×34/2×43 |
Maximum single rope speed of jib luffing mechanism | (m/min) | 41.6 |
Maximum turning speed | (r/min) | 1.5/2.0 |
Maximum travel speed | (km/h) | 1.3 |
Gradeability | (%) | 30 |
Average ground pressure | (MPa) | 0.105 |
Maximum single rope speed of tower arm luffing mechanism | (m/min) | 41.6 |
Maximum single rope speed of super lift luffing | (m/min) | - |
FAQ
1.What are your advantages compared with other suppliers and manufacturers?
High quality:
As a professional and reliable supplier, we are experienced in the QualityInspection and Control.Every product will be strictly
inspected before it is delivered to our customers.
Competitive price:
We are so glad to provide the most favorable prices for our customers. And the prices are negotiable by which a win-win result
could be achieved.
2. Which payment terms are available us ?
T/T terms or other. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment.
3. How long with the delivery?
Normally it takes about 20 days.
4. How about service?
24 hours online, and skype/QQ/wechat/whatsapp so on
5. Whats pareparts can you supply?
All kinds of spare parts of Hitachi Cat Sumitomo Kobelco Doosan , Zoomlion, Shantui,,Lugong,,CUMMINS ENGINE,etc.